ci: read the production env from Infisical and deploy on push
Build and Deploy Spoon / quality (push) Failing after 9s
Build and Deploy Spoon / build-images (push) Skipped

Each job logs in as the read-only spoon-ci machine identity and exports the Infisical prod environment, so production values no longer live in Gitea. After pushing the images, CI asks the VPS to redeploy podman-spoon.service over the forced-command deploy key, with the key passed through env so the printed script never contains it. Installs survive a half-written runner cache, and one production deploy runs at a time.

Infisical prod carries a valid JWKS; the copy in DOTENV_PROD had escaped quotes, so the Convex env sync had been serving invalid JSON at /.well-known/jwks.json. The first sync from Infisical replaces it.
This commit is contained in:
Gabriel Brown committed 2026-10-01 15:39:23 -04:00
1 parent 919d185a85
commit 26a4fd0705
6 files changed
+125 -12

No files matched your search

+14
View File
@@ -0,0 +1,14 @@
#!/usr/bin/env bash
# Install on a runner, and survive a half-written cache entry.
#
# Runners have failed twice with "Fail extracting tarball" on a different
# package each time, on different machines, and passed on a re-run. The cache
# is shared between jobs on a host, so a job that dies mid-write leaves an
# entry the next job cannot read. Clearing it and installing again costs a
# couple of minutes; a human re-running the job costs however long it takes
# someone to notice.
set -euo pipefail
if bun install --frozen-lockfile; then exit 0; fi
echo "Install failed. Clearing the bun cache and trying once more." >&2
rm -rf "${BUN_INSTALL_CACHE_DIR:-$HOME/.bun/install/cache}"
bun install --frozen-lockfile